General Information
Official designation: | St 2166 BW 520 (6338514 0) |
---|---|
Beginning of works: | 1956 |
Completion: | 1957 |
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Construction method: |
In-situ casting on falsework |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mantel, Neustadt an der Waldnaab (Kreis), Bavaria, Germany |
---|---|
Address: | St 2166 |
Coordinates: | 49° 38' 58.67" N 12° 2' 29.97" E |
Technical Information
Dimensions
main span | 36.22 m | |
deck depth | 1.05 - 1.75 m | |
total length | 84.5 | |
span lengths | 24.14 m - 36.22 m - 24.14 m | |
deck width | 10.6 | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1956-1957)
Owner
Client
Design
Structural engineering
Checking engineering
- Haeckel (checking engineer)
Contractor
Prestressing
Recalculation to current codes
Client
Structural engineering
Checking engineering
-
Fritsche Ingenieure GbR
- Thomas Fritsche (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20071079 - Published on:
12/04/2016 - Last updated on:
12/04/2016