General Information
Status: | project phase |
---|
Project Type
Structure: |
Three-span cable-stayed bridge Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Material: |
Material hybrid bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
China |
---|---|
Crosses: |
|
Technical Information
Dimensions
main span | 1 160 m | |
total length | 1 860 m | |
pylons | height | 262 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2024): Comparative Analysis of the Tensioning Schemes of the Prestressed Concrete Wide Box Girder of Guanyinsi Changjiang River Bridge. Presented at: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, pp. 627-634.
- (2024): Study on Steel-Shell Concrete Composite Section Bridge Tower Based on Solid Finite Element Analysis : A Case Study of The Guanyinsi Yangtze River Bridge. Presented at: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, pp. 321-327.
- About this
data sheet - Structure-ID
20090402 - Published on:
28/01/2025 - Last updated on:
28/01/2025