General Information
Other name(s): | A-1 Vistula River Bridge |
---|---|
Beginning of works: | 2009 |
Completion: | 14 October 2011 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge main bridge: Haunched girder bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
approach viaduct: Incremental launching |
Location
Location: |
Grudziądz, Kuyavian-Pomeranian Voivodeship, Poland |
---|---|
Address: | A-1 |
Crosses: |
|
Coordinates: | 53° 26' 29.61" N 18° 40' 53.32" E |
Technical Information
Dimensions
total length | 1 954 m | |
main bridge | ||
---|---|---|
total length | 400.00 m | |
span lengths | 110.0 m - 180.0 m - 110.0 m | |
northern approach viaduct | ||
number of spans | 21 | |
southern approach viaduct | ||
number of spans | 12 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Expansion joints
Relevant Web Sites
- About this
data sheet - Structure-ID
20059220 - Published on:
10/01/2011 - Last updated on:
05/11/2017