0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Grosser Kolonnenweg Tramway Bridge

General Information

Beginning of works: June 1997
Completion: November 1998
Status: in use

Project Type

Location

Location: , , ,
Address: Großer Kolonnenweg
Crosses:
  • Mittellandkanal
Part of:
Next to: Grosser Kolonnenweg Road Bridge (1998)
Replaces: Grosser Kolonnenweg Bridge (1961)
Coordinates: 52° 24' 27.67" N    9° 44' 22.81" E
Show coordinates on a map

Technical Information

Dimensions

arch span 58.40 m
total width 10.00 m

Materials

deck steel
arches steel
abutments reinforced concrete

Chronology

June 1997

Construction begins.

April 1998

Opened to traffic.

November 1998

Completion.

Participants

Original design
Structural engineering
Checking engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008700
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine