0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel des Grands-Goulets
Beginning of works: 2005
Completion: 28 June 2008
Duration of works: 32 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
, , ,
Coordinates: 45° 0' 7.29" N    5° 25' 27.34" E
Coordinates: 45° 0' 42.19" N    5° 24' 29.95" E
Show coordinates on a map

Technical Information

Dimensions

width 7 m
length 1 710 m

Quantities

volume of extracted material 180 000 m³

Cost

cost of construction ca. Euro 29 000 000

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20025719
  • Published on:
    04/01/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine