General Information
Other name(s): | Tunnel des Grands-Goulets |
---|---|
Beginning of works: | 2005 |
Completion: | 28 June 2008 |
Duration of works: | 32 months |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Echevis, Drôme (26), Auvergne-Rhône-Alpes, France Saint-Martin-en-Vercors, Drôme (26), Auvergne-Rhône-Alpes, France |
---|---|
Coordinates: | 45° 0' 7.29" N 5° 25' 27.34" E |
Coordinates: | 45° 0' 42.19" N 5° 24' 29.95" E |
Technical Information
Dimensions
width | 7 m | |
length | 1 710 m |
Quantities
volume of extracted material | 180 000 m³ |
Cost
cost of construction | ca. Euro 29 000 000 |
Participants
Owner
Client
Contractor
Formwork & shoring
Relevant Web Sites
Relevant Publications
- La chimie au service du tunnel des Grands-Goulets. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5387 (23 February 2007), pp. 62-63. (2007):
- Grands Goulets. Un tunnel en autogestion. In: Chantiers de France, n. 411 (June 2008), pp. 32-34. (2008):
- Une machine spéciale aux Grands-Goulets. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5404 (22 June 2007), pp. 51.
- Un tunnel alpin sous haute surveillance. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5459 (11 July 2008). (2008):
- Tunnel des Grands Goulets. Un béton fibré de polymères pour la galerie. In: Chantiers de France, n. 398 (March 2007), pp. 22-23. (2007):
- About this
data sheet - Structure-ID
20025719 - Published on:
04/01/2007 - Last updated on:
28/05/2021