General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Berne, Switzerland |
---|---|
Address: | A16 |
Part of: | |
Coordinates: | 47° 15' 55.01" N 7° 21' 56.17" E |
Coordinates: | 47° 14' 42.47" N 7° 21' 20.09" E |
Technical Information
Dimensions
length | 2472 m | |
length of bored tunnels | 2 389 m | |
length of cut-and-cover tunnels | 83 m |
Chronology
5 November 2013 | Opened to traffic |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A16 Transjurane: ulteriori novità novembrine. In: Strade e Autostrade, v. 18, n. 103 (January 2014), pp. 18-19. (2014):
- La Transjurane. In: Strade e Autostrade, v. 9, n. 53 (September 2005), pp. 34-51. (2005):
- About this
data sheet - Structure-ID
20065817 - Published on:
26/11/2013 - Last updated on:
28/05/2021