General Information
Other name(s): | Darul Hana Bridge; Harmony Bridge |
---|---|
Beginning of works: | October 2016 |
Completion: | May 2017 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Three-span cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 337 m | |
bridge surface | 1 095 m² | |
walkway width | 3.25 m | |
main bridge | ||
---|---|---|
main span | 133 m | |
total length | 267 m | |
deck | deck depth | 1.62 m |
pylons | height | 50 m |
length | 64 m | |
number | 2 |
Cost
cost of construction | Malaysian ringgit 35 000 000 |
Materials
pylon |
steel
|
---|---|
deck truss |
steel tubes
(S 355)
|
Participants
Structural engineering
Checking engineering
Co-contractor
Steel construction
Relevant Web Sites
Relevant Publications
- (2017): The Golden Bridge - A Footbridge Over the Sarawak River. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- About this
data sheet - Structure-ID
20074356 - Published on:
10/12/2017 - Last updated on:
27/09/2022