General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Schwäbisch Gmünd, Ostalbkreis, Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 48' 10.28" N 9° 48' 21.27" E |
Coordinates: | 48° 47' 48.93" N 9° 46' 56.49" E |
Technical Information
Dimensions
total length | 2 230 m | |
clear interior profile | 9.50 m x 4.50 m | |
roadway / carriageway width | 7.50 m |
Quantities
concrete volume | 164 015 m³ | |
reinforcing steel | 21 000 t | |
volume of extracted material | 363 500 m³ | |
shotcrete | 25 800 m² | |
volume of earthworks | 349 500 m³ |
Cost
cost of construction | Euro > 280 000 000 |
Participants
Owner
Client
Design
Design consultants
- Jean-Jacques Zimmermann (design consultant)
Structural engineering
Soil investigation report
Checking engineering
- Dieter Kirschke (checking engineer)
- Matthias Gerold (checking engineer)
- Jörg Münzner (checking engineer)
Co-contractor
- Baresel AG
- Ed. Züblin AG
- G. Hinteregger & Söhne Baugesellschaft m.b.H.
- ÖSTU-STETTIN Hoch- und Tiefbau GmbH
Site supervision
Technical equipment engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2014. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2014, pp. 129-145.
- About this
data sheet - Structure-ID
20066265 - Published on:
25/06/2014 - Last updated on:
28/05/2021