General Information
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
height | 23 - 58 m | |
total length | 1 108 m | |
span lengths | 22 x 48 m | |
number of spans | 22 | |
Initial construction | ||
---|---|---|
truss | depth | 8 m |
Reconstruction | ||
deck slab | width | 5.60 m |
thickness | 0.30 m | |
truss | depth | 6 m |
Quantities
Reconstruction | ||
---|---|---|
deck slab | concrete volume | 2 150 m³ |
truss | structural steel | 3 700 t |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Chronology
2002 — 2004 | Strengthening of all piers through addition of an additional concrete shell to every pier as well as replacement of all truss elements of the superstructure. |
---|
Participants
Owner
Co-contractor
- Dyckerhoff & Widmann AG
- Grün & Bilfinger
- Gutehoffnungshütte, Actienverein für Bergbau und Hüttenbetrieb
- Maschinenfabrik Augsburg Nürnberg
Reconstruction (2004)
Structural engineering
Checking engineering
Co-contractor
Relevant Web Sites
Relevant Publications
- Belgian rebuild sets tough formwork challenges. In: Bridge Design & Engineering, v. 9, n. 33 (4th Quarter 2003), pp. 79.
- Moresnet Viaduct. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 142-143. (2004):
- Safe and steady. In: Bridge Design & Engineering, v. 10, n. 34 (1st Quarter 2004), pp. 68-69. (2004):
- Trägertausch mit Pommes und Bratwurst. In: Frankfurter Allgemeine Zeitung (F.A.Z.), "Technik und Motor", 17.02.2004. :
- Les travaux de reconstruction du viaduc de Moresnet. In: Ossature métallique, v. 14 (July 1949), pp. 335. (1949):
- About this
data sheet - Structure-ID
20010803 - Published on:
01/12/2003 - Last updated on:
05/02/2016