General Information
Status: | in use |
---|
Project Type
Structure: |
Immersed tube tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Immersed tube method |
Location
Location: |
Boston, Suffolk County, Massachusetts, USA |
---|---|
For: |
|
Part of: | |
Coordinates: | 42° 20' 49.42" N 71° 2' 26.59" W |
Coordinates: | 42° 20' 46.85" N 71° 3' 36.26" W |
Technical Information
Dimensions
tunnel length | 464.82 m | |
number of lanes | 6 + 4-5 |
Cost
cost of construction | United States dollar 485 000 000 |
Materials
tunnel structure |
concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Challenging use of immersed tubes in the Fort Point Channel, Boston. Presented at: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998, pp. 117. (1998):
- Fort Point Channel – design of composite caisson/tunnel immersed tubes. Presented at: Immersed Tunnel Techniques 2, Cork, Ireland, 23-24 April 1997, pp. 245-259. (1997):
- About this
data sheet - Structure-ID
20005015 - Published on:
16/09/2002 - Last updated on:
01/09/2024