General Information
Name in local language: | Farriseidet bru |
---|---|
Beginning of works: | January 2014 |
Completion: | July 2017 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Steel bridge |
Structure: |
Cable-stayed bridge with curved deck Single-span single-pylon cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Larvik, Vestfold og Telemark, Norway |
---|---|
Coordinates: | 59° 3' 23.52" N 10° 0' 39.56" E |
Technical Information
Dimensions
length | 570 m | |
abutments | number | 2 |
deck | width | 28 m |
eastern approach viaduct | ||
---|---|---|
total length | 280 m | |
number of spans | 5 | |
main bridge | ||
main span | 120 m | |
number of spans | 2 | |
pylon | height | 74.30 m |
pylons | number | 1 |
stay cables | length | 55 - 120 m |
western approach viaduct | ||
total length | 169 m | |
number of spans | 3 |
Quantities
reinforcing steel | 7 500 t | |
formwork | 45 000 m² | |
deck | concrete volume | 42 000 m³ |
main bridge | ||
---|---|---|
main span | structural steel | 1 100 t |
pylon heads | structural steel | 110 t |
Cost
cost of construction | Norwegian krone 757 000 000 |
Materials
pylon |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
deck of main bridge |
steel
|
deck of approach viaducts |
prestressed concrete
|
Participants
Client
Design
Architecture
Contractor
Stay cables
Anti-corrosion protection
Relevant Web Sites
- About this
data sheet - Structure-ID
20073190 - Published on:
17/07/2017 - Last updated on:
20/08/2023