0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Autobahnbrücke Griesheim
Beginning of works: 1975
Completion: June 1978
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Main River
Carries:
  • Autobahn A5
Part of:
Replaces: Autobahnbrücke Griesheim (1935)
Coordinates: 50° 5' 21.82" N    8° 37' 3.14" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 x 313.30 m
span lengths 93.00 m - 128.30 m - 92.00 m
number of spans 3

Cost

cost of construction German Mark 27 700 000

Materials

superstructure reinforced concrete

Chronology

Beginning of 1975

Construction begins.

July 1975

A caisson built in Cologne is shipped in for the construction of the river piers.

January 1976

Piers are completed.

22 September 1976

First superstructure enters service.

December 1976
— February 1977

Demolition of the existing bridge.

August 1977

Construction of the second superstructure completed.

21 June 1978

The second superstructure enters service.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005256
  • Published on:
    21/09/2002
  • Last updated on:
    15/11/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine