General Information
Other name(s): | Talbrücke Enzenstetten |
---|---|
Beginning of works: | 2005 |
Completion: | 2010 |
Duration of works: | 63 months |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Rigid frame bridge with inclined legs |
Material: |
Prestressed concrete bridge |
Location
Location: |
Hopferau, Ostallgäu, Bavaria, Germany |
---|---|
Carries: |
|
Part of: | |
Carries: |
A 7 Motorway (Germany)
|
Coordinates: | 47° 37' 46" N 10° 36' 9" E |
Technical Information
Dimensions
total length | 557.5 m | |
span lengths | 95 m - 120 m - 107.50 m - 95 m - 85 m - 55 m | |
number of spans | 6 | |
deck | total width | 29.50 m |
piles | length | 6 100 m |
Quantities
deck | concrete volume | 2 060 m³ |
prestressing steel | 850 t | |
portal legs | structural steel | 240 t |
substructure | concrete volume | 5 700 m³ |
reinforcing steel | 560 t |
Materials
deck |
prestressed concrete
|
---|---|
portal legs |
steel
|
Participants
Owner
Client
Design
Architecture
Structural engineering
Geotechnical/geological experts
Checking engineering
- Gert Albrecht (checking engineer)
- Norbert Nieder (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2011. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2011, pp. 15-26.
- Neubau der Talbrücke Enzenstetten. Umstellung von Stahlverbund auf Spannbeton. In: Brückenbau, v. 3, n. 1 ( 2011), pp. 48-51. (2011):
- About this
data sheet - Structure-ID
20019729 - Published on:
19/02/2006 - Last updated on:
05/02/2016