General Information
Name in local language: | Aurachtalbrücke Emskirchen |
---|---|
Beginning of works: | 2013 |
Completion: | 26 November 2016 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Support conditions: |
for registered users |
Structure: |
Double T-section girder bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Emskirchen, Neustadt an der Aisch-Bad Windsheim, Bavaria, Germany |
---|---|
Replaces: |
Emskirchen Viaduct (1936)
|
Coordinates: | 49° 33' 11.88" N 10° 43' 24.18" E |
Technical Information
Dimensions
total length | 530 m | |
span lengths | 40 m - 9 x 50 m - 40 m | |
number of spans | 11 | |
number of tracks | 2 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20071908 - Published on:
20/10/2016 - Last updated on:
09/06/2017