0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2012
Completion: June 2013
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Emme River
Coordinates: 47° 4' 12.77" N    7° 36' 12.77" E
Show coordinates on a map

Technical Information

Dimensions

width 5.7 m
total length 70 m
span 59 m
deck width 3.80 m

Quantities

concrete volume 70 m³

Cost

cost of construction ca. Swiss Franc 360 000

Materials

truss wood
abutments reinforced concrete

Participants

Structural engineering
Concrete construction
Timber construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20078051
  • Published on:
    30/07/2019
  • Last updated on:
    30/07/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine