General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
New Austrian Tunnelling Method (NATM) |
Location
Location: |
Elz, Limburg-Weilburg, Hesse, Germany |
---|---|
Part of: |
|
Coordinates: | 50° 24' 46.76" N 7° 58' 11.65" E |
Coordinates: | 50° 24' 35.63" N 7° 59' 4.37" E |
Technical Information
Dimensions
tunnel length | 1 110 m |
Quantities
concrete volume | 38 279 m³ | |
reinforcing steel | 3 300 t | |
volume of extracted material | 126 402 m³ |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Tunnelbauwerke der Neubaustrecke Köln-Rhein/Main. In: Eisenbahntechnische Rundschau ( 2000), pp. 13-19. (2000):
- About this
data sheet - Structure-ID
20005789 - Published on:
02/10/2002 - Last updated on:
16/06/2022