0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunnel Elzer Berg
Beginning of works: 1998
Completion: 2001
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , , ,
Part of:
Coordinates: 50° 24' 46.76" N    7° 58' 11.65" E
Coordinates: 50° 24' 35.63" N    7° 59' 4.37" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 110 m

Quantities

concrete volume 38 279 m³
reinforcing steel 3 300 t
volume of extracted material 126 402 m³

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005789
  • Published on:
    02/10/2002
  • Last updated on:
    16/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine