General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Structure: |
Box girder bridge Haunched girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Grabow, Amt Grabow, Ludwigslust-Parchim, Mecklenburg-Western Pomerania, Germany |
---|---|
Carries: |
A 14 Motorway (Germany)
|
Coordinates: | 53° 15' 29.71" N 11° 32' 15.01" E |
Technical Information
Dimensions
total length | 506.50 m | |
span lengths | 36.00 m - 55.00 m - 42.50 m - 52.00 m - 78.00 m - 52.00 m - 37.00 m - 2 x 29.00 m - 2 x 26.00 m - 23.50 m - 20.50 m | |
number of spans | 13 | |
bridge surface | 14 486 m² | |
crossing angle | 73.9 - 77.6 gon | |
piles | diameter | 1.500 m |
superstructure | deck width | 28.60 m |
Quantities
foundations | reinforcing steel | 425 t |
total length of piles | 2 160 m | |
substructure | concrete volume | 3 745 m³ |
reinforcing steel | 732 t | |
superstructure | structural steel | 5 748 t |
concrete volume | 6 909 m³ | |
reinforcing steel | 1 935 t |
Design Loads
design code(s) | DIN EN 1991-2/NA |
Cost
cost of construction | Euro 35 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
piles |
reinforced concrete
|
deck slab |
reinforced concrete
(C 35/45)
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
- Meyer + Schubart (superstructure)
Soil investigation report
Architectural consulting
Checking engineering
- Winfried Koldrack (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2018. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2018, pp. 41-53.
- About this
data sheet - Structure-ID
20077332 - Published on:
30/04/2019 - Last updated on:
30/04/2019