Elbebrücke Hohenwarthe

General Information

Official designation: BW 44
Beginning of works: June 1994
Completion: December 1997
Duration of works: 42 months
Status: in use

Project Type

Structure: Haunched girder bridge
main bridge:
Single-cell box girder bridge
approach viaduct:
Triple T-section girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Steel bridge
main bridge:
Steel-concrete composite bridge
Construction method: approach viaduct:
Formwork carriage

Location

Location: , , , ,
Crosses:
  • Elbe River
Carries:
  • Autobahn A2
Part of:
Replaces: Elbebrücke Hohenwarthe (1935)
Coordinates: 52° 13' 16.00" N    11° 42' 15.00" E
Show coordinates on a map

Technical Information

Dimensions

main span 140.71 m
total length 1 170 m
bridge surface 44 692 m²
approach viaduct width 37.50 m
deck depth 1.70 m
span lengths 28.20 m - 24 × 33.50 m - 11.20 m
main bridge width 40.00 m
deck depth 4.52 - 7.03 m
span lengths 93.00 m - 140.71 m - 93.00 m

Cost

cost of construction German Mark 107 000 000
approach viaduct cost of construction German Mark 40 000 000
cost of construction per m² German Mark 2 119
main bridge cost of construction German Mark 67 000 000
cost of construction per m² German Mark 3 061

Materials

deck of main bridge steel
deck of approach viaduct prestressed concrete

Advertisement

Participants

Owner
Original design
Structural engineering
Construction drawings
Checking engineering
Contractor
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009925
  • Date created
    08/08/2003
  • Last Update
    05/02/2016