0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 14 April 2020
Completion: 24 November 2022
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Eider
Coordinates: 54° 18' 2.02" N    9° 38' 51.36" E
Show coordinates on a map

Technical Information

Dimensions

main span 30.03 m
total length 71.08 m
span lengths 20.50 m - 30.03 m - 20.55 m
bridge surface 1 535 m²
number of lanes 2 x 2
total width 22.10 m
roadway / carriageway width 2 x 7.75 m
deck deck depth 1.15 - 1.65 m
girder depth 0.80 - 1.30 m
number of cells 2
superelevation 3.50 %
deck 1 deck width 10.86 m
deck 2 deck width 11.20 m
piers number 2 x 2 x 2
piles diameter 1.18 m

Quantities

deck structural steel 330 t
concrete volume 765 m³
reinforcing steel 165 t
substructure concrete volume 2 285 m³
reinforcing steel 201 t

Design Loads

live load LM 1
design code(s) DIN EN 1991-2 + NA

Cost

cost of construction Euro 19 700 000

Materials

piers reinforced concrete (C 30/37)
piles reinforced concrete (C 30/37)
deck slab reinforced concrete (C 35/45)
abutments reinforced concrete (C 30/37)
girders steel (S 355)
pile caps reinforced concrete (C 30/37)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20088670
  • Published on:
    04/06/2024
  • Last updated on:
    04/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine