General Information
Status: | in use |
---|
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Jonches, Auxerre, Yonne (89), Bourgogne-Franche-Comté, France |
---|---|
Crosses: |
|
Coordinates: | 47° 49' 12" N 3° 34' 31" E |
Technical Information
Dimensions
total length | 135 m |
Quantities
concrete volume | 2 000 m³ | |
prestressing steel | 40 t | |
reinforcing steel | 230 t |
Materials
deck |
high-strength prestressed concrete
|
---|
Participants
Owner
Client
Design
Architecture
- Berdj Mikaelian (architect)
Structural engineering
Checking engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le BHP, le béton dernier cri. In: Freyssinet Magazine, n. 215 (September - December 2002), pp. 4-5. (2002):
- Le nouveau pont de Jonches. In: Ouvrages d'art, n. 44 (December 2003), pp. 2-10. (2003):
- Le poussage, une méthode avantageuse. In: Freyssinet Magazine, n. 215 (September - December 2002), pp. 9-12.
- About this
data sheet - Structure-ID
20006523 - Published on:
05/11/2002 - Last updated on:
05/02/2016