0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2010
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Our River
Replaces: Dörnauel Mill Bridge (1972)
Coordinates: 50° 1' 52.69" N    6° 7' 46.45" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 30 m
number of spans 2
abutments number 2
pier number 1

Materials

abutments reinforced concrete
pier reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20057312
  • Published on:
    13/08/2010
  • Last updated on:
    27/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine