General Information
Completion: | 2009 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Truss arch bridge |
Material: |
Steel bridge |
Structure: |
Half-through arch bridge |
Location
Technical Information
Dimensions
total length | 442 m | |
span lengths | 99 m - 242 m - 99 m | |
number of spans | 3 |
Design Loads
design speed | 350 km/h |
Materials
truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Dongping Channel Bridge: Long-Span Steel Arch Bridge in High-Speed Railway, China. In: Structural Engineering International, v. 21, n. 4 (November 2011), pp. 492-496. (2011):
- Research on the major dominant bridges of the Wuhan-Guangzhou High-speed Railway, China. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062073 - Published on:
10/10/2011 - Last updated on:
18/05/2023