General Information
Completion: | 2014 |
---|---|
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bergara, Gipuzkoa, Basque Country, Spain |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 43° 5' 46.39" N 2° 25' 45.97" W |
Technical Information
Dimensions
main span | 80 m | |
total length | 900 m | |
span lengths | 50.00 m - 80.00 m - 70.00 m - 60.00 m - 3 x 65.00 m - 70.00 m - 65.00 m - 70.00 m - 3 x 65.00 m - 45.00 m | |
deck width | 14.00 m | |
number of spans | 14 | |
height above valley floor or water | 90 m | |
girder depth | 3.94 - 5.94 m | |
piers | width | 6.50 - 10.80 m |
height | max. 86 m | |
thickness | 3.50 - 6.25 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
-
IDEAM S.A.
- Francisco Millanes Mato (designer)
- Miguel Ortega Cornejo (designer)
- Pablo Solera Pérez (designer)
- Helder Figueiredo (designer)
- Jokin Ugarte González (designer)
Structural engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaduct over the River Deba on the 'Basque-Y' high-speed rail line. In: Hormigón y acero, v. 67, n. 280 (September 2016), pp. e1-e22. (2016):
- El viaducto sobre el río Deba en la «Y-Vasca» de alta velocidad. In: Hormigón y acero, v. 67, n. 280 (September 2016), pp. 287–308. (2016):