General Information
Project Type
Structure: |
Three-span cable-stayed bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Rotation around a vertical axis |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Vienna 11 (Simmering), Vienna, Austria |
---|---|
Crosses: |
|
Coordinates: | 48° 10' 51" N 16° 27' 4" E |
Technical Information
Dimensions
total length | 230.40 m | |
span lengths | 55.70 m - 119.00 m - 55.70 m | |
number of spans | 3 | |
bridge surface | ca. 5 300 m² | |
deck | deck depth | 2.80 m |
deck width | 15.80 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
Chronology
July 1973 | Beginning of construction. |
---|---|
March 1975 | Completion. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Betrachtungen über seilverspannte Massivbrücken, ausgehend vom Bau der Schrägseilbrücke über den Donaukanal in Wien. In: Beton- und Stahlbetonbau, v. 71, n. 11 (November 1976), pp. 261-265, 298-304. (1976):
- Bridge engineering. A global perspective. Thomas Telford, London (United Kingdom), ISBN 9780727732156, pp. 634, 638. (2003):
- Ponts haubanées. Presses Polytechniques et Universitaires Romandes, Lausanne (Switzerland), pp. 175-177. (1985):
- About this
data sheet - Structure-ID
20001085 - Published on:
06/10/2000 - Last updated on:
28/05/2021