General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Warsaw, Masovian Voivodeship, Poland |
---|---|
Coordinates: | 52° 11' 51.21" N 21° 3' 6.32" E |
Technical Information
Dimensions
total length | 2 x 806 m | |
number of spans | 16 | |
horizontal radius of curvature | 1 300 m |
Quantities
prestressing steel | 2 x (235 t + 112 t) |
Materials
deck |
prestressed concrete
|
---|
Participants
Structural engineering
Co-contractor
Subcontractor
Prestressing
Formwork
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le poussage, une méthode avantageuse. In: Freyssinet Magazine, n. 215 (September - December 2002), pp. 9-12.