General Information
Completion: | 1961 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Sils im Domleschg, Grisons, Switzerland |
---|---|
Coordinates: | 46° 41' 38.33" N 9° 28' 48.65" E |
Technical Information
Dimensions
main span | 27.0 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
ROBO®CONTROL Permanent – Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed and they are made available to the clients through internet.
[more]Structural health monitoring at Cugnielertobel Bridge II and Lavoitobel Bridge
Modern automated structural health monitoring (SHM) systems have much to offer the responsible engineers in the construction, inspection, maintenance and renovation of structures in general, and of key struc ... [more]
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Christian Menn. Brückenbauer. Birkhäuser Verlag (Basel, Boston, Berlin), Basel (Switzerland), pp. 44. (1997):
- About this
data sheet - Structure-ID
20072452 - Published on:
18/01/2017 - Last updated on:
07/03/2017