0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: July 1869
Completion: June 1871
Status: in use

Project Type

Function / usage: Railroad (railway) bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Material: main bridge:
Steel bridge
approach viaduct:
Masonry bridge
Structure: approach viaduct:
Segmental arch bridge

Awards and Distinctions

Location

Location: , ,
Crosses:
  • Chemnitz River
Next to: Chemnitztalviadukt (1899)
Coordinates: 50° 51' 12.65" N    12° 55' 34.68" E
Coordinates: 50° 51' 14.54" N    12° 55' 45.93" E
Show coordinates on a map

Technical Information

Dimensions

total length 308 m
number of spans 15
number of tracks 1
approach viaduct
total length 118 m
number of spans 9
main bridge
total length 180 m
span lengths 6 x 25.5 m
number of spans 6

Materials

main bridge steel
approach viaduct masonry

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20090400
  • Published on:
    28/01/2025
  • Last updated on:
    28/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine