General Information
Name in local language: | Pont de la Charente |
---|---|
Completion: | 2002 |
Duration of works: | 18 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Jarnac, Charente (16), Nouvelle-Aquitaine, France |
---|---|
Address: | RN 141 |
Crosses: |
|
See also: |
Charente Bridge (South Arm) (2004)
|
Coordinates: | 45° 40' 36.37" N 0° 9' 10.93" W |
Technical Information
Dimensions
total length | 142.800 m | |
span lengths | 29.400 m - 37.800 m - 46.200 m - 29.400 m | |
number of spans | 4 | |
deck | girder depth | 1.150 m / 1.200 m |
total width | 23.55 m |
Quantities
prestressing steel | 90 t | |
reinforcing steel | 400 t | |
paint | 1 338 m² | |
arch | structural steel | 296.5 t |
deck | concrete volume | 1 900 m³ |
substructure | concrete volume | 1 600 m³ |
Cost
cost of construction | French Franc 6 600 000 |
Materials
deck |
reinforced concrete
|
---|---|
arches |
steel tubes
|
Participants
Owner
Client
Design
- Michel Virlogeux (designer)
Architecture
-
Alain Spielmann Architecte
- Alain Spielmann (architect)
Technical advisor to the client
Structural engineering
Checking engineering
Main contractor
Steel construction
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ouvrage de franchissement de la Charente à Jarnac. Pont en arc mixte tubulaire. In: Bulletin ouvrages métalliques, n. 4 ( 2005), pp. 176-184. (2005):
- About this
data sheet - Structure-ID
20019105 - Published on:
21/01/2006 - Last updated on:
05/02/2016