0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Changsha High-Speed Rail Bridges

General Information

Completion: December 2013
Status: in use

Project Type

Location

Location: , ,
Coordinates: 28° 7' 27.39" N    113° 3' 39.56" E
Coordinates: 28° 7' 32.32" N    113° 3' 41.12" E
Show coordinates on a map

Technical Information

Dimensions

piles diameter 2.2 m
Eastern bridge
width 10.80 m
number of tracks 1
main bridge total length 224 m
span lengths 112 m - 80 m - 32 m
number of spans 3
pylon pylon height (above deck) 51.80 m
pylon height (above ground) 79.925 m
Western bridge
width 10.80 m
number of tracks 1
main bridge total length 224 m
span lengths 112 m - 80 m - 32 m
number of spans 3
pylon pylon height (above deck) 51.80 m
pylon height (above ground) 64.425 m

Quantities

steel for cable-stays 294.66 t

Design Loads

design speed 350 km/h
live load 80% UIC

Materials

superstructure prestressed concrete
piers reinforced concrete
pylons reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20080285
  • Published on:
    30/10/2020
  • Last updated on:
    30/10/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine