0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Cebu–Cordova Link Expressway; Third Cebu–Mactan Bridge
Beginning of works: 2017
Completion: 30 April 2022
Status: in use

Project Type

Location

Location: , ,
, ,
Coordinates: 10° 17' 11.48" N    123° 53' 57.48" E
Show coordinates on a map

Technical Information

Dimensions

total length 8 900 m
number of lanes 2 x 2
main bridge
main span 390 m
total length 653.00 m
span lengths 6.50 m - 64.4 m - 60.6 m - 390 m - 60.6 m - 64.4 m - 6.50
vertical navigation clearance 51 m
deck deck depth 3.50 m
deck width 26.90 m
piers height 44.32 m
pylons height 139 m
stay cables number 56

Materials

deck prestressed concrete
piers reinforced concrete
pylons reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070501
  • Published on:
    19/01/2016
  • Last updated on:
    31/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine