Special Construction features of the Cable-Stayed Bridge between the islands of Cebu and Mactan (Republic of the Philippines)

 Special Construction features of the Cable-Stayed Bridge between the islands of Cebu and Mactan (Republic of the Philippines)
Author(s): , , , ,
Presented at IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, published in , pp. 691-699
DOI: 10.2749/istanbul.2023.0691
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.54 MB

The Cebu-Cordova Link Expressway is a road concession project with a crowning achievement: the 653.00-m long cable-stayed bridge between the islands of Cebu and Mactan. This bridge is the longest c...
Read more

Bibliographic Details

Author(s): (ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(ACCIONA Construcción)
(Carlos Fernández Casado S.L. (CFC), Madrid.)
(Carlos Fernández Casado S.L. (CFC), Madrid.)
(Carlos Fernández Casado S.L. (CFC), Madrid.)
(Carlos Fernández Casado S.L. (CFC), Madrid.)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Published in:
Page(s): 691-699 Total no. of pages: 9
Page(s): 691-699
Total no. of pages: 9
Year: 2023
DOI: 10.2749/istanbul.2023.0691
Abstract:

The Cebu-Cordova Link Expressway is a road concession project with a crowning achievement: the 653.00-m long cable-stayed bridge between the islands of Cebu and Mactan. This bridge is the longest cable-stayed span in the Philippines, and its construction posed several unique challenges, such as high seismic activity, geological variability, and frequent typhoons. Furthermore, the busy navigation channel below the bridge had to be kept open throughout the building process. This paper provides an overview of the construction process, highlighting these distinctive difficulties.

Keywords:
cable-stayed bridge Geometric control deck-closure large diameter pile tilt table

Structures and Projects