General Information
Other name(s): | Villanueva de Castellón Bridge |
---|---|
Completion: | 13 October 1930 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Villanueva de Castellón, Valencia, Valencia, Spain |
---|---|
Coordinates: | 39° 4' 13.57" N 0° 31' 6.92" W |
Technical Information
Dimensions
total length | 170 m | |
span lengths | 4 x 32 m | |
number of spans | 4 | |
Initial construction | ||
---|---|---|
roadway / carriageway width | 4.50 m | |
deck | deck width | 6 m |
Widening | ||
deck | deck width | 9.90 m |
Materials
deck |
reinforced concrete
|
---|---|
arches |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ampliación de un puente arco histórico en Castelló de la Ribera. In: Hormigón y acero, v. 50, n. 212 (2nd Quarter 1999), pp. 31-41. (1999):
- Prefabricación de tableros en arco. Realizaciones. In: Hormigón y acero, v. 48, n. 203 (1st Quarter 1997), pp. 123-127. (1997):
- La prefabricación en la rehabilitación de puentes. Tableros con directriz recta y arcos. In: Hormigón y acero, v. 47, n. 200 (2nd Quarter 1996), pp. 63-71. (1996):
- About this
data sheet - Structure-ID
20076275 - Published on:
02/11/2018 - Last updated on:
02/11/2018