La prefabricación en la rehabilitación de puentes. Tableros con directriz recta y arcos

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 200, v. 47
Page(s): 63-71
Abstract:

The precast concrete in the old bridges rehabilitation. Decks and archs

The bridges rehabilitation adapts the old structures to the news functional needs. In cases of the old steelwork or reinforced concretework decks, the sustitution is necessary. The use of precast concrete elements permits: to reduce the deck weight increment, using high-strength concrete. To shorten the rehabilitation time. To fit the erection process in the useful parts of the old structure. To resolve with precission and strict geometry the bearing and connection details. As an example, the rehabilitation of a 1930s bridge with four spans of 32m built according to the Official Models of Arch Bridges by Mr. Jose Ribera is described. The precast technology allows to adapt many old bridges to the news traffic and security needs.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076016
  • Published on:
    08/11/2018
  • Last updated on:
    08/11/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine