General Information
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge Monorail bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
arch span | 420 m | |
main bridge | ||
---|---|---|
total length | 800 m | |
span lengths | 88 m - 102 m - 420 m - 102 m - 88 m | |
deck width | 36.500 m | |
number of spans | 5 |
Quantities
structural steel | 25 900 t | |
concrete volume | 53 000 m³ |
Materials
piers |
prestressed concrete
|
---|---|
arch |
steel
|
Participants
Design
Main contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Design and Construction of the Main Spans of the Chongqing Caiyuanba Bridge, China. In: Structural Engineering International, v. 20, n. 3 (August 2010), pp. 296-298. (2010):
- Design of the main spans of the Chongqing Caiyuanba Bridge. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 101-102. (2004):
- Design of the Main Spans of the Chongqing Caiyuanba Bridge. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004, pp. 86-87. (2004):
- On the record. In: Bridge Design & Engineering, n. 48 (3rd Quarter 2007), pp. 34-36. (2007):
- About this
data sheet - Structure-ID
20011455 - Published on:
10/01/2004 - Last updated on:
27/11/2018