General Information
Name in local language: | Autobahnbrücke Bremen-Neustadt |
---|---|
Beginning of works: | 2004 |
Completion: | 2007 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Steel bridge |
Structure: |
Single-span single-pylon cable-stayed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bremen, Bremen, Germany |
---|---|
Carries: |
|
Part of: | |
Connects to: |
Hochstrasse Autobahn A281 (1995)
|
Coordinates: | 53° 3' 39.13" N 8° 47' 6.14" E |
Technical Information
Dimensions
total length | 311.50 m | |
span lengths | 36.50 m - 35.00 m - 127.00 m - 42.00 m - 35.00 m - 36.00 m | |
number of spans | 6 | |
bridge surface | 8 100 m² | |
deck | width | 26.00 m |
number of longitudinal girders | 5 | |
piles | total length | 2 700 m |
pylons | height from ground level | 49.95 m |
Quantities
deck | structural steel | 3 300 t |
concrete volume | 3 000 m³ | |
reinforcing steel | 900 t | |
foundations | concrete volume | 1 600 m³ |
reinforcing steel | 245 t | |
piers | structural steel | 140 t |
concrete volume | 100 m³ | |
piles | reinforcing steel | 155 t |
pylons | structural steel | 780 t |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 | |
military load class | MLC 50/50 – 100 (STANAG) |
Materials
piers |
steel
|
---|---|
pylons |
steel
|
deck slab |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
Co-contractor
Steel construction
Stay cables
Construction supervision
Relevant Web Sites
Relevant Publications
- Die 281 in Bremen – Eine städtebauliche Herausforderung mit einer Schrägseilbrücke in Verbundbauweise. Presented at: 17. Dresdner Brückenbausymposium, Dresden, 13. März 2007. (2007):
- Brücken und Tunnel der Bundesfernstraßen 2009. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-61-3, 2009, pp. 7-21.
- Bypassing Bremen. In: Bridge Design & Engineering, v. 14, n. 50 (1st Quarter 2008), pp. 20.
- City link. In: Bridge Design & Engineering, n. 48 (3rd Quarter 2007), pp. 26-27.
- Planung der Hochstraße BAB A 281 (Bremen) in Stahlverbundbauweise mit luftdicht verschweißten Kästen. In: Bauingenieur, v. 84, n. 5 (May 2009), pp. 208. (2009):
- About this
data sheet - Structure-ID
20005280 - Published on:
22/09/2002 - Last updated on:
05/02/2016