General Information
Name in local language: | Bözbergtunnel |
---|---|
Beginning of works: | 9 March 2016 |
Completion: | 2020 |
Status: | under construction |
Project Type
Structure: |
Tunnel |
---|---|
Construction method: |
Tunnel boring machine (TBM) |
Function / usage: |
Railroad (railway) tunnel |
Location
Location: |
Effingen, Argovia, Switzerland Schinznach-Dorf, Argovia, Switzerland |
---|---|
To replace: |
Bözberg Rail Tunnel (1875)
|
Coordinates: | 47° 27' 27.27" N 8° 7' 44.11" E |
Coordinates: | 47° 28' 22.77" N 8° 6' 14.17" E |
Technical Information
Dimensions
length | 2.7 km | |
number of tracks | 2 | |
track gauge | 1 435 mm | |
TBM | diameter | 12.36 m |
Cost
cost of construction | Swiss Franc 350 000 0000 |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Challenges and innovative solutions at the new construction of the Bözberg Tunnel. In: Geomechanics and Tunnelling, v. 11, n. 1 (February 2018), pp. 62-75. (2018):
- About this
data sheet - Structure-ID
20078902 - Published on:
17/12/2019 - Last updated on:
28/05/2021