0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Bözbergtunnel
Beginning of works: 9 March 2016
Completion: 2020
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , ,
, ,
To replace: Bözberg Rail Tunnel (1875)
Coordinates: 47° 27' 27.27" N    8° 7' 44.11" E
Coordinates: 47° 28' 22.77" N    8° 6' 14.17" E
Show coordinates on a map

Technical Information

Dimensions

length 2.7 km
number of tracks 2
track gauge 1 435 mm
TBM diameter 12.36 m

Cost

cost of construction Swiss Franc 350 000 0000

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20078902
  • Published on:
    17/12/2019
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine