General Information
Name in local language: | Bözbergtunnel |
---|---|
Completion: | 2 August 1875 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Location
Location: |
Effingen, Argovia, Switzerland Schinznach-Dorf, Argovia, Switzerland |
---|---|
Will be replaced by: |
Bözberg Rail Tunnel (2020)
|
Coordinates: | 47° 27' 27.94" N 8° 7' 44.53" E |
Coordinates: | 47° 28' 23.32" N 8° 6' 14.68" E |
Technical Information
Dimensions
length | 2 526 m | |
number of tracks | 2 | |
tunnel section area | 70 m² | |
track gauge | 1 435 mm |
Quantities
excavated material | 176 820 m³ |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078901 - Published on:
17/12/2019 - Last updated on:
28/05/2021