0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Puente Boca del Cerro
Completion: 2023
Status: in use

Project Type

Function / usage: Railroad (railway) bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Support conditions:
Material: Material hybrid bridge
Structure: Structurae Plus/Pro - Subscribe Now!
Structure: main span:
Deck truss bridge
main span:
Non-parallel chord truss bridge
main span:
Warren type truss bridge
Material: main span:
Steel-reinforced concrete composite bridge
side spans:
Prestressed concrete bridge
Construction method: side spans:
In-situ casting on falsework
Structure: side spans:
Box girder bridge

Location

Location: ,
Next to: Puente Boca del Cerro (1950)
Coordinates: 17° 25' 37.13" N    91° 29' 27.74" W
Show coordinates on a map

Technical Information

Dimensions

span lengths 30 m - 160 m - 30 m
number of spans 3
abutments number 2
piers number 2
truss on-center distance between girders 4.50 m
depth 6.30 - 11.40 m

Materials

piers reinforced concrete
truss steel

Participants

Design
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20090398
  • Published on:
    28/01/2025
  • Last updated on:
    28/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine