0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1903
Completion: 1905
Status: in use

Project Type

Structure: Deck arch bridge
Material: Steel bridge
Structure: Two-hinged arch bridge
Material: Structurae Plus/Pro - Subscribe Now!
Function / usage: upper deck:
Tramway, light or metro rail bridge
lower deck:
Road bridge

Location

Location: , , ,
, , ,
Crosses:
  • Seine River
Part of:
Replaces: Passy Footbridge (1878)
Connects to: Metro Bridge across Place des martyrs Juifs du Vélodrome d'Hiver (1905)
Coordinates: 48° 51' 20" N    2° 17' 15" E
Show coordinates on a map

Technical Information

Dimensions

total length 257 m
lower deck number of lanes 2
upper deck number of tracks 2
bridge 1
span lengths 30 m - 54 m - 30 m
number of spans 3
abutments number 2
lower deck deck width 25 m
piers number 2
bridge 2
span lengths 24 m - 42 m - 24 m
number of spans 3
abutments number 2
lower deck deck width 25 m
piers number 2

Materials

piers masonry
arches steel
abutments masonry

Notes

The Passy Footbridge was moved and transformed into this bridge.

Participants

Architecture
Engineering
Contractor
(role unknown)

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000234
  • Published on:
    09/05/1999
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine