General Information
Name in local language: | Beverentunnel |
---|---|
Completion: | 1969 |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Construction method: |
Immersed tube method |
Structure: |
Immersed tube tunnel |
Location
Location: |
Beveren, East Flanders, Flanders, Belgium |
---|---|
Address: | R2 |
Part of: | |
Coordinates: | 51° 16' 9.04" N 4° 16' 33.51" E |
Coordinates: | 51° 15' 36.51" N 4° 16' 7.79" E |
Technical Information
Dimensions
tunnel length | 1 475 m | |
length of immersed tube tunnel section | 700 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2013): Refurbishment and lifetime assessment of the Beverentunnel in Liefkenshoek. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, pp. 118-119.
- About this
data sheet - Structure-ID
20017281 - Published on:
16/08/2005 - Last updated on:
28/05/2021