0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Refurbishment and lifetime assessment of the Beverentunnel in Liefkenshoek

 Refurbishment and lifetime assessment of the Beverentunnel in Liefkenshoek
Author(s): ,
Presented at IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, published in , pp. 118-119
DOI: 10.2749/222137813806474408
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.58 MB

The Liefkenshoek Railway Link is a new railway line for freight transportation in the port of Anwerp. Along with two new 6,1km long bored single-track tunnels the Beverentunnel, a 38 year old reinf...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Published in:
Page(s): 118-119 Total no. of pages: 7
Page(s): 118-119
Total no. of pages: 7
Year: 2013
DOI: 10.2749/222137813806474408
Abstract:

The Liefkenshoek Railway Link is a new railway line for freight transportation in the port of Anwerp. Along with two new 6,1km long bored single-track tunnels the Beverentunnel, a 38 year old reinforced concrete tunnel crossing the Waasland dock on the left bank of the river Scheldt, was incorporated in the new railroad track. The 1200m long tunnel was built in open trench before the dock was excavated. A test program was set up to gather information and to deduct the remaining lifetime. As results were positive the tunnel will be taken into service after a structural refurbishment. Assessing a structure’s lifetime becomes even more important as DBFM-contracts arise frequently.

Keywords:
refurbishment durability lifetime assessment tunnel Liefkenshoek Railway Link

Structures and Projects