0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bellinzona-Lugano Rail Viaduct

General Information

Beginning of works: 2011
Completion: 11 December 2014
Status: in use

Project Type

Location

Location: , ,
See also: Lugano-Bellinzona Rail Viaduct (2015)
Coordinates: 46° 9' 30.62" N    8° 59' 9.06" E
Show coordinates on a map

Technical Information

Dimensions

total length 442 m

Materials

deck prestressed concrete

Case Studies and Applied Products

RESTON®POT – Pot Bearings

RESTON®POT – Pot Bearings

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.

[more]
RESTON®STU – Shock Transmission Units

RESTON®STU – Shock Transmission Units

The mageba Shock Transmission Unit (STU) is designed to be connected between bridge structure components to form a rigid link under dynamic loads induced by forces such as vehicle braking and earthquakes. It can be used for strengthening ... [more]

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070505
  • Published on:
    20/01/2016
  • Last updated on:
    08/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine