General Information
Completion: | November 2001 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Material: |
Concrete-filled steel tube (CFST) bridge |
Function / usage: |
Railroad (railway) bridge |
Structure: |
Truss arch bridge |
Construction method: |
Rotation around a vertical axis |
Location
Technical Information
Dimensions
height above valley floor or water | 275 m | |
arch | arch span | 236 m |
Materials
arch |
concrete-filled steel tubes
|
---|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- China's first concrete-filled steel tube (CFST) arch railway bridge: the Beipanjiang long span bridge on the Shuicheng-Baiguo line. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 877-882. (2001):
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Concrete-filled Arch Railway Bridge, China. In: Structural Engineering International, v. 12, n. 3 (August 2002), pp. 151-152. (2002):
- New developments on Chinese arch bridges techniques. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 815-820. (2001):