General Information
Project Type
Support conditions: |
for registered users |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Multi-span continuous girder bridge |
Material: |
Prestressed concrete bridge |
Function / usage: |
Tramway, light or metro rail bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
piers: Rigid frame bridge with inclined legs |
Location
Location: |
Toulouse, Haute-Garonne (31), Occitanie, France |
---|---|
Connects to: |
Mirail – Basso-Cambo Metro Station (1993)
|
Coordinates: | 43° 34' 16.15" N 1° 23' 31.85" E |
Coordinates: | 43° 34' 5.48" N 1° 23' 34.60" E |
Technical Information
Dimensions
total length | 565 m | |
abutments | number | 2 |
piers | number | 13 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20086323 - Published on:
10/08/2023 - Last updated on:
10/08/2023