General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mellrichstadt, Rhön-Grabfeld, Bavaria, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 23' 30.08" N 10° 18' 52.24" E |
Technical Information
Dimensions
main span | 47.6 m | |
total length | 312 m | |
span lengths | 37 m - 5 x 47.6 m - 37 m | |
number of spans | 7 | |
bridge surface | 8 692 m² | |
height above valley floor or water | 39 m | |
number of lanes | 2 x 2 | |
deck | deck depth | 3.6 m |
deck width | 28.5 m |
Quantities
concrete volume | 11 500 m³ | |
prestressing steel | 228 t | |
reinforcing steel | 1 490 t |
Cost
cost of construction | Euro 8 121 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2007): Incrementally launched bridges along the A 71/73 – Special Features. Presented at: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, pp. 282-285.
- About this
data sheet - Structure-ID
20032195 - Published on:
10/10/2007 - Last updated on:
05/02/2016