General Information
Project Type
Structure: |
Rigid frame bridge |
---|---|
Function / usage: |
Tramway, light or metro rail bridge Road bridge |
Material: |
Steel bridge |
Location
Location: |
Vienna 2 (Leopoldstadt), Vienna, Austria Vienna 9 (Alsergrund), Vienna, Austria |
---|---|
Crosses: |
|
Replaces: |
Maria Theresia Bridge (1873)
|
Coordinates: | 48° 13' 7" N 16° 22' 12" E |
Technical Information
Dimensions
total length | 78.5 m | |
span lengths | 11.0 m - 55.8 m - 11.0 m | |
number of spans | 3 | |
deck | width | 25.5 m |
Materials
deck |
steel
|
---|---|
portal legs |
steel
|
Chronology
1945 | Dynamited by German troops. |
---|---|
12 January 1946 | Re-opening. |
Participants
Relevant Web Sites
Relevant Publications
- Brücken in Wien. Ein Führer durch die Baugeschichte. Springer, Vienna (Austria), pp. 87-88. (2005):
- About this
data sheet - Structure-ID
20004403 - Published on:
26/07/2002 - Last updated on:
05/02/2016