0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Maria-Theresien-Brücke
Beginning of works: 1872
Completion: 6 June 1873
Status: demolished (1929)

Project Type

Structure: Chain suspension bridge
Function / usage: Road bridge

Location

Location: , ,
, ,
Crossed:
  • Danube Canal
Replaced by: Augarten Bridge (1931)

Technical Information

Dimensions

span 61.5 m
deck roadway / carriageway width ca. 11 m
walkway width 2 x 3.8 m

Chronology

6 June 1873

Opening.

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004404
  • Published on:
    26/07/2002
  • Last updated on:
    24/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine