General Information
Name in local language: | Talbrücke Aschaffquelle |
---|---|
Official designation: | BW 230c |
Beginning of works: | 2013 |
Completion: | 2015 |
Status: | in use |
Project Type
Construction method: |
Span-by-span in-situ casting on falsework |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Double T-section girder bridge Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Aschaffenburg (Kreis), Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 49° 56' 40.34" N 9° 20' 13.99" E |
Technical Information
Dimensions
total length | 202.50 m | |
span lengths | 35.25 m - 3 x 44.00 m - 35.25 m | |
number of spans | 5 | |
bridge surface | 8 070 m² | |
deck | deck depth | 2.40 m |
deck width | 18.05 m + 21.80 m | |
piles | diameter | 1.20 m |
Quantities
concrete volume | 12 000 m³ | |
prestressing steel | 290 t | |
reinforcing steel | 1 400 t | |
piles | total length of piles | 1 500 m |
Cost
cost of construction | ca. Euro 12 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Concrete supplier
Relevant Web Sites
Relevant Publications
- Chronik des Brückenbaus. In: (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310. (2016):
- About this
data sheet - Structure-ID
20074916 - Published on:
21/03/2018 - Last updated on:
21/03/2018