ANZAC Bridge
-
O'Neill, Ken / Edmonds, Colin (2012): ANZAC Bridge Maintenance Project. Presented at: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, pp. 1468-1475.
https://doi.org/10.2749/222137912805111997
-
Mellier, Erik / Kuhn, Eric / Koscher, Xavier / Sylvestre, Aurélien (2013): ANZAC Bridge Stay Cable Upgrade. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, pp. 640-641.
https://doi.org/10.2749/222137813806548659
-
Tang, Man-Chung (1998): Balancing Act. In: Civil Engineering Magazine, v. 68, n. 2 (February 1998), pp. 42-45.
-
Wheeler, W. Ken / Lothringer, Sue / Bennett, Mark V. (1994): Glebe Island bridge - Australia's new cable-stayed bridge (Australia). Presented at: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994, pp. 307.
-
Knop, D. / Bishop, H. (1995): Die Glebe-Island-Schrägkabelbrücke in Sydney. In: Beton- und Stahlbetonbau, v. 90, n. 12 (December 1995), pp. 304-310.
https://doi.org/10.1002/best.199500490