Advertisement
ANZAC Bridge
General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Pyrmont, City of Sydney, Sydney, New South Wales, Australia Rozelle, Municipality of Leichhardt, Sydney, New South Wales, Australia |
---|---|
Crosses: |
|
Coordinates: | 33° 52' 9.00" S 151° 11' 9.00" E |
Technical Information
Dimensions
main span | 345 m | |
total length | 805 m | |
span lengths | 140 m - 345 m - 140 m | |
number of lanes | 8 |
Cost
cost of construction | Australian dollar 80 000 000 |
Materials
deck |
prestressed concrete
|
---|
Notes
ANZAC = Australia & New Zealand Army Corps
Participants
Initial construction (1992-1996)
Owner
Contractor
Cables
Prestressing
Formwork
Cable maintenance (2011)
Cable repairs
Monitoring (2011)
Monitoring equipment
Relevant Web Sites
Relevant Publications
- Balancing Act. In: Civil Engineering Magazine, v. 68, n. 2 (February 1998), pp. 42-45. (1998):
- Glebe Island bridge - Australia's new cable-stayed bridge (Australia). Presented at: Ponts suspendus et à haubans. Cable-stayed and suspension bridges, Deauville, 12.-15.10.1994, pp. 307. (1994):
- Die Glebe-Island-Schrägkabelbrücke in Sydney. In: Beton- und Stahlbetonbau, v. 90, n. 12 (December 1995), pp. 304-310. (1995):
- About this
data sheet - Structure-ID
20001191 - Date created
17/01/2001 - Last Update
05/02/2016